Traffic and Pedestrian Management Plan for Crane Activation this Saturday (15/04/23)

This coming Saturday 15/04.2023, Connect Construct will carry out maintenance to the plant on the roof of the Central Quay Building on Britain Quay. This maintenance will require the presence of a Crane located at the front entrance of the Central Quay building and will require the closure of the roadway at the entrance of the Central Quay Building, the footpath directly outside the entrance of the Central Quay building will also need to be closed, Connect Construct will set up traffic & pedestrian management at key locations as presented in the below map.

Related News

MISS SAIGON 13 – 17 January 2026

Read Post
Children's pirate-themed festival banner with Beware of Pirates sign and North Wall Quay event details.

Dublin Port Riverfest

Read Post
Pixie Lott in 'Breakfast at Tiffany's' poster, promoting Truman Capote's classic adapted by Richard Greenberg.

Breakfast at Tiffany’s at Bord Gais Energy Theatre

Read Post